top of page

Publication

▽ 국제 저널논문 60. A boundary and voxel-based 3D geological data management system leveraging BIM and GIS;Khan, Muhammad Shoaib, In Sup Kim, Jongwon Seo;2023 59. Vision-Based Activity Classification of Excavators by Bidirectional LSTM;In-Sup Kim, Kamran Latif, Jeonghwan Kim, Abubakar Sharafat, Dong-Eun Lee, Jongwon Seo;2022.12. 58. Impact of Virtual Reality-Based Design Review System on User’s Performance and Cognitive Behavior for Building Design Review Tasks;Muhammad Umair, Abubakar Sharafat, Dong-Eun Lee, Jongwon Seo;2022.07. 57. An integrated hbim framework for the management of heritage buildings;Muhammad Shoaib Khan, Muhammad Khan, Mushk Bughio, Bushra Danish Talpur, In Sup Kim, Jongwon Seo;2022.07. 56. Development and Assessment of an Intelligent Compaction System for Compaction Quality Monitoring, Assurance, and Management;Soomin Lee, Abubakar Sharafat, In Sup Kim, Jongwon Seo;2022.07. 55. Implementation experiments on convolutional neural network training using synthetic images for 3D pose estimation of an excavator on real images;Bilawal Mahmood, SangUk Han, Jongwon Seo;2022.01. 54. Methodology for Voxel-Based Earthwork Modeling;Muhammad Shoaib Khan, Jeonghwan Kim, Soohyun Park, Soomin Lee, Jongwon Seo;2021.10. 53. Three-dimensional ground model generation and automated earthwork target model generation system based on parameter input;Seung Soo Lee, Min Sung Kang, Seung Man Yang, Woo Yong Jung, Jong Won Seo;2021.09. 52. BIM-GIS-based integrated framework for underground utility management system for earthwork operations;Abubakar Sharafat, Muhammad Shoaib Khan, Kamran Latif, Waqas Arshad Tanoli, Wonyoung Park, Jongwon Seo ;2021.06. 51. Risk analysis of TBM tunneling projects based on generic bow-tie risk analysis approach in difficult ground conditions;Abubakar Sharafat, Kamran Latif, Jongwon Seo;2021.05. 50.Geotechnical property modeling and construction safety zoning based on GIS and BIM integration;Muhammad Shoaib Khan, Jaemin Park, Jongwon Seo;2021.04. 49. The integration of earthwork design review and planning using UAV-based point cloud and BIM;Jeonghwan Kim, Soomin Lee, Jongwon Seo, Dong-Eun Lee, Hee Seon Choi;2021.04. 48. BIM-based tunnel information modeling framework for visualization, management, and simulation of drill-and-blast tunneling projects;Abubakar Sharafat, Muhammad Shoaib Khan, Kamran Latif, Jongwon Seo;2021.03. 47. 2d soil-bucket simulation using material point method for efficient earthwork modeling;Jeonghwan Kim, Jongwon Seo, Daeyong Um, Dongeun Lee;2021 46. Blade control in Cartesian space for leveling work by bulldozer Automation in Construction, Yongseok Lee; Sangho Kim; Jongwon Seo; Jeakwon Han; Changsoo Han;  2020. 10 45. Estimation of the volume of a rock layer using kriging method for energy efficient excavation,H Zhuang; J Kim; S Lee; J Seo;2020.09 44. Task planning strategy and path similarity analysis for an autonomous excavator Automation in Construction, Jeonghwan Kim; Dongeun Lee; Jongwon Seo;  2020. 04 ​ 43. Flexible 3D Model Partitioning System for nD-Based BIM Implementation of Alignment-Based Civil Infrastructure ASCE Journal of Management in Engineering, Abubakar Sharafat; Seungsoo Lee; Kyungtae Kim; Waqas Arshad Tanoli; Jongwon Seo;  2020. 01 ​ 42. Controlled blasting in underground construction: A case study of a tunnel plug demolition in the Neelum Jhelum hydroelectric project Tunnelling and Underground Space Technology, Abubakar Sharafat; Waqas Arshad Tanoli; Georgios Raptis; Jongwon Seo;  2019. 11 ​ 41. An Alternative Way to Determine Overall Performance of Infrastructure - A Case Study of Korean Infrastructure Facilities KSCE Journal of Civil Engineering, Sanghyeok Kang; Soohyun Park; Jongwon Seo;  2019. 02 ​ 40. 3D Design Modeling Application in Machine Guidance System for Earthwork Operations KSCE Journal of Civil Engineering, Waqas Arshad Tanoli; Jongwon Seo; Abubakar Sharafat; Seungsoo Lee;  2018. 11 ​ 39. Value Rating Model for Intangible Assets in Civil Engineering Consulting Firms in Korea KSCE Journal of Civil Engineering, Seungwoo Phi; Jongwon Seo; Riho Lee;  2018. 10 ​ 38. Association Rules Mined from Construction Accident Data KSCE Journal of Civil Engineering, Dong-Pil Shin, Young-Jun Park, Jongwon Seo, and Dong-Eun Lee,  2018. 05 ​ 37. Utilization analysis methodology for fleet telematics of heavy earthwork equipment Automation in Construction, Seung Soo Lee, Sang-il Park, Jongwon Seo,  2018. 02 ​ 36. Modular data communication methods for a robotic excavator Automation in Construction, Jeonghwan Kim, Seung Soo Lee, Jongwon Seo, Vineet R. Kamat,  2018. 06 ​ 35. Interaction Analysis for Vision-based Activity Identification of Earthmoving Excavators and Dump Trucks Automation in Construction, Jinwoo Kim, , Seokho Chi, Jongwon Seo,  2018. 03 ​ 34. Interaction Analysis for Vision-based Activity Identification of Earthmoving Excavators and Dump Trucks Automation in Construction, Jinwoo Kim, , Seokho Chi, Jongwon Seo,  2018. 03 ​ 33. Eco-economic excavator configuration method Automation in Construction, Hong-Chul Lee, Han-Seong Gwak, Jongwon Seo, Dong-Eun Lee,  2018. 02 ​ 32. Optimal cut-fill pairing and sequencing method in earthwork operation Automation in Construction, Han-Seong Gwak, Jongwon Seo, Dong-Eun Lee,  2018. 03 31. Improving Dynamic Proximity Sensing and Processing for Smart Work-zone Safety Automation in Construction, JeeWoong Park, Xiaoyu Yang, Yong K. Cho, Jongwon Seo,  2017. 12 ​ 30. Assessment of operator's situation awareness for smart operation of mobile cranes Automation in Construction, Yihai Fang, Yong K. Cho, Frank Durso, Jongwon Seo,  2018. 01 ​ 29. Development of a trip time for bit exchange simulator for drilling time estimation Geothermics, Seung Soo Lee, Kwang Yeom Kim, Jong Won Seo,  2018. 01 ​ 28. VIRTUAL GRAPHIC REPRESENTATION OF CONSTRUCTION EQUIPMENT FOR DEVELOPING A 3D EARTHWORK BIM Journal of Civil Engineering and Management, Sungwoo MOON, Jongwon SEO,  2017. 12 ​ 27. Long-term trend analysis of CO in the Yongsan district of Seoul, Korea, between the years 1987 and 2013 Atmospheric Pollution Research, Azmatullah Khan, Jan E. Szulejko, M.-S. Bae, Zang Ho Shon, Jong-Ryeul Sohn, J.W. Seo, E.-C. Jeon, Ki-Hyun Kim,  2017. 04 ​ 26. Prototyping a Remotely-Controlled Machine for Concrete Surface Grinding Operations Journal of Civil Engineering and Management, Sungwoo MOON, Jeonghwan KIM, Jongwon SEO,  2017. 02 ​ 25. Study on the Slip Resistance of Embo-Spray Coating of Urethane-based Floor Material KSCE Journal of Civil Engineering, Chawoong Yoon, Jongwon Seo, Seungsoo Lee, Jisoo Park, Gwangyeom Kim,  2017. 01 ​ 24. Simulation-Based Assessment of Workers’ Muscle Fatigue and Its Impact on Construction Operations Journal of Construction Engineering and Management, JoonOh Seo; SangHyun Lee; and Jongwon Seo,  2016. 11 ​ 23. Optical marker-based end effector pose estimation for articulated excavators ELSEVIER SCIENCE BV, Kurt M. Lundeen, Suyang Dong, Nicholas Fredricks, Manu Akula, Jongwon Seo, Vineet R. Kamat,  2016. 02 ​ 22. Spatial factors affecting the loading efficiency of excavators ELSEVIER SCIENCE BV, Jungho Yoon, Jeonghwan Kim, Jongwon Seo, Sangwook Suh,  2014. 12 ​ 21. Estimation of instantaneous and daily net radiation from MODIS data under clear sky conditions: a case study in East Asia Springer, Kyotaek Hwang, Minha Choi, Seung Oh Lee, Jong-Won Seo,  2013. 09 ​ 20. Cross-Section Designs for the Safety Performance of Buffer-Separated High-Occupancy Vehicle (HOV) Lanes American Society of Civil Engineers, Kitae Jang, Sanghyeok Kang, Jongwon Seo, Ching-yao Chan, 2013. 03 ​ 19. Spatiotemporal Analysis of Macroscopic Patterns of Urbanization and Traffic Safety: Case Study in Sacramento County, California Transportation Research Record, Sang Hyeok Kang, J. Seo, 2013.02 ​ 18. GIS Method for Haul Road Layout Planning in Large Earthmoving Projects:Framework and Case Study ASCE's Journal of Construction Engineering and Management, Sang Hyeok Kang, J. Seo, 2013.02 ​ 17. Intelligent Navigation Strategies for an Automated Earthwork System Automation in Construction, Sung-Keun Kim, J. Seo, Jeffrey S. Russell, 2012.01 ​ 16. Task planner design for an automated excavation system Automation in Construction, J. Seo, Seungsoo Lee, Jeonghwan Kim, Sung-Keun Kim, 2011.11 ​ 15. Improving Safety in Carriage-Based Formwork of Concrete Bridge Decks KSCE Journal of Civil Engineering, Myeong Gu Lee, J. Seo, Sang-Hyeok Kang, 2011.05 ​ 14. Effectiveness of Remote Control for a Concrete Surface Grinding Machine Automation in Construction, Sungwoo Moon, Byongsoo Yang, Jeonghwan Kim, J. Seo, 2010.10 13. Value Analysis System Development for Water Treatment Plant Maintenance Method Selection Canadian Journal of Civil Eng., J. Seo, M. Lee, P. Jung, 2010.09 ​ 12. Construction Technology Valuation for Patent Transaction KSCE Journal of Civil Engineering, Se Joon Hong, J. Seo, Young Suk Kim, Sang Hyeok Kang, 2010.03 ​ 11. Safety Assessment Using Imprecise Reliability for Corrosion-damaged Structures Computer-Aided Civil and Infrastructure Engineering, Hyun-Ho Choi, J. Seo, 2009.05 ​ 10. Probabilistic Value Analysis Methodology for Public Water Supply Systems Civil engineering and environmental systems, Pyungki Jung, J. Seo, Junbok Lee, 2009.06 ​ 9. Structural dynamic behavior of skew sandwich plates with laminated composite faces Composites Part B : engineering, Vol 39, No. 2, pp.316-326 ISSN:1359-8368, T. Park, S.-Y.Lee, J. Seo, G.Z. Voyiadjis, 2008.03 ​ 8. A PDA and wireless web-integrated system for quality inspection and defect management of apartment housing projects Automation in Construction, Vol. 17, No. 1, pp.163-179, Young S. Kim, Se W. Oh, Yong K. Cho, J. Seo, 2008.01 ​ 7. Risk-based Safety Impact Assessment Methodology for Underground Construction Projects in Korea Journal of Construction Engineering and Management, Vol.134, No. 1, pp.72-81, J. Seo and Hyun Ho Choi, 2008.01 ​ 6. Graphical Modeling and Simulation for design and control of a tele-operated clinker clearing robot Automation in Construction, Vol. 16, No. 1, pp.96-106, J. Seo, Carl Haas, Kamel Saidi, 2007.01 ​ 5. Geographic information system based roadway Construction Projects Canadian Journal of Civil Engineering, Vol. 33, pp.508-520, J. Seo, Sanghyeok Kang, 2006. 05 ​ 4. Risk Assessment Methodology for Underground Construction Projects Journal of Construction Engineering and Management, Vol. 130, No. 2, pp.258-272, Hyonam Cho, Hyunho Choi, J. Seo, 2004. 03 ​ 3. Graphical Control Interface for Construction and Maintenance Equipment Journal of Construction Engineering and Management, Vol. 126, No. 3, pp.210-218, J. Seo, Carl T. Haas, Kamel Saidi, and S.V. Sreenivasan, 2000.05 ​ 2. Design of a Tele-Operated Robot for the Maintenance of Boiler Hoppers in Electric Power Plants Journal of Mechanical Design, Vol 121, pp.647-651, K.S. Saidi, J. Seo, S.V. Sreenivasan, C.T. Haas, A.E. Traver, 1999.12 ​ 1. A Decision Tool for Microtunneling Method Selection Journal of Construction Engineering and Management, Vol. 125, No. 2, pp.123-131, Masashi Ueki, Carl T. Hass, and J. Seo, 1999.03

▽ 국내 학술지 49. 일본의 제도· 정책 벤치마킹을 통한 국내 건설 ICT 시공 방안에 관한 연구-토공사를 중심으로,Vol.41, No.4, pp.429-439, 박수현, 김정환, 서종원, 심호, 2021.08. 48. 단지조성 토공분야 건설 자동화 기술 도입을 위한 로드맵 수립,Vol.39, No.6, pp.893-901,임동희, 윤희천, 김석규, 서종원. 2019.12. 47. 토공 운반경로 탐색 시스템 개발에 관한 연구 대한토목학회논문집, Vol.38, No.6, pp.957-965, 강상혁, 박수현, 서종원, 2018.12 ​ 46. 효율적 품질관리를 위한 지능형 다짐 시스템 개발 대한토목학회논문집, Vol.38, No.5, pp.751-760, 이수민, 이리호, 박상일, 서종원, 2018.10 ​ 45. 공사 현장에서의 Machine Guidance 적용에 관한 사례연구 대한토목학회논문집, Vol.38, No.5, pp.721-731, 김완봉, 이리호, 박상일, 서종원, 2018.10 ​ 44. 3D Earthwork BIM Design Process for a Road Project Journal of KIBIM, Vol.7, No.2, pp.8-15, Hassnain Raza ・Park, Sang-Il ・Lee, Seung Soo ・Waqas Arshad Tanoli ・Seo, Jongwon, 2017.07 ​ 43. 다짐공사에 대한 롤러의 효율적 품질관리 방안 연구 대한토목학회논문집, Vol. 37, No. 3, pp.621-627, 이수민, 이승수, 유상훈, 서종원, 2017.06 ​ 42. 3D 토공 BIM 시스템 데이터베이스 구축을 위한 속성 데이터 관리 Journal of KIBIM, Vol. 6 No. 4, pp.27-34, Sungwoo Moon, Jongwon Seo, 2016.12 ​ 41. 덤프의 이동경로 모니터링을 통한 생산성 분석 대한토목학회 논문집, Vol.36, No.6 pp.565-571, 이학준, 권영민, 윤차웅, 서종원, 2016.06 ​ 40. 유전자알고리즘을 활용한 최적화된 라운드트립 발생 예측 시스템 개발 터널과 지하공간,Vol.25, No.6 pp.534-542, 이승수, 서종원, 김광염, 신휴성, 2015.12 ​ 39. 교통류 보존형 터널단면 확대 시공기술의 경제적 타당성 분석 The Journal of Engineering Geology,Vol.25, No.4 pp.1-14, 이승수, 김동규, 서종원, 2015.11 ​ 38. 교통흐름을 고려한 터널단면 확대 시공기술의 사회적 손실비용 산정에 관한 연구 Journal of Korean Tunnelling and Underground Space Association, Vol.17, No.4 pp.487-497, 이승수, 김동규, 서종원, 2015.07 ​ 37. 단지공사의 토공구획 계획 모델 대한토목학회 논문집, Vol.35, No.3 pp.715-723, 백현기, 강상혁, 서종원, 2015.06 ​ 36. 항공 및 해상관제기술 사례연구를 통한 건설장비 관제 시스템 활용 방안에 관한 연구 대한토목학회,Vol.35, No.2 pp.493-500, 박지수, 서종원, 2015.02 ​ 35. LCCA기반 터널 자산관리 시스템 개발을 위한 연구개발 프레임웍 설계 한국터널지하공간학회,Vol.16, No.6 pp.615-625, 이승수, 김광염, 김동규, 신휴성, 서종원, 2014.11 ​ 34. 선형기반 시설물을 위한 Flexible BIM 시스템의 설계 대한토목학회,Vol. 34, No.2, 이승수, 이민주, 정종윤, 서종원, 2014.4 ​ 33. BIM기반 사회기반 시설물 유지관리 도입을 위한 경제적 타당성 분석 대한토목학회,Vol.34, No.1 pp.285-292, 김정환, 지승구, 정태형, 서종원, 2014.2 ​ 32. Risk Based Decision Support for Final Closing Section of a Sea Dike KICEM Journal of Construction Engineering and Project Management, pp 49-57, 지성현, 강승해, 김정환, 서종원, 2013.7 ​ 31. Design Structure Matrix: A Model Proposal and Implementation on harbor and Building Design Project 한국건설관리학회논문집, 제17권 제1호 pp 144, Salman Akram, 김정환, 피승우, 서종원, 2013.1 ​ 30. 자동화 굴삭로봇의 운용단위 작업계획수립을 위한 로컬영역설계모듈 개발 대한토목학회논문집, 제33권 제1호 pp 1, 장중현, 서종원, 이승수, 윤차웅, 2013.1 ​ 29. Design Structure Matrix를 활용한 플랜트 설계의 최적 협업 체계에 관한 연구 대한토목학회논문집, 제33권 제1호 pp 2, 윤종이, 김정환, 강상혁, 서종원, 2013.1 ​ 28. 미끄럼저항성능을 고려한 바닥재 시공법의 성능평가방안 한국건설관리학회논문집, 제13권 제2호 pp 58-69, 윤차웅, 설재남, 서종원, 2012.3 ​ 27. 인공신경망을 적용한 기획단계의 도로건설 공사비 예측 모델 대한토목학회논문집, 제31권 제6D호 pp 829-837, 한형동, 김정환, 윤중호, 서종원, 2011.11 ​ 26. 자산관리개념을 접목한 네트워크 방식의 도로시설물 유지관리시스템 개발 구조물진단학회지, 제15권 제4호 pp 146-153, 지승구, 서종원, 2011.7 ​ 25. 민간투자사업의 사업평가관리 절차개선모델 및 프로그램 개발 건설관리학회논문집, 제12권 제3호 pp 99-109, 정평기, 백현기, 서종원, 2011.5 ​ 24. 민간투자사업 파트너쉽지원관리(PSM) 업무모델 개발 대한토목학회논문집, 제31권 제1D호 pp 99-109, 정평기, 백현기, 서종원, 2011.1 ​ 23. GIS를 이용한 토공 운반로 탐색 방법론 - 단지공사 사례를 중심으로 - 대한토목학회논문집, 제30권 제6D호 pp 631-639, 강상혁, 백경근, 백현기, 서종원, 2010.11 ​ 22. 지하구조물건설 현장지원 통합관리시스템 도입을 위한 경제적 타당성 분석 대한토목학회논문집, 제30권 제5D호 pp 513-522, 백현기, 장용구, 서종원, 2010.9 ​ 21. 경량전철의 도시별 적용실태조사와 적정성에 관한 연구 - 수도권을 중심으로 - 대한토목학회논문집, 제30권 제4D호 pp 403-411, 김종기, 하승우, 서종원, 2010.7 ​ 20. 도심지 대규모 지하공사의 리스크 분석 체계 개발 한국지반공학회논문집,제26권 제3호 pp 59-67, 서종원, 윤지혁, 김정환, 지성현, 2010.3 ​ 19. 엠보탄 도막방수공법의 성능평가를 위한 실험적 연구 및 VE분석 한국건설관리학회 논문집,제10권 제5호 pp123-134, 윤차웅, 이승수, 김상록, 서종원, 2009.9 ​ 18. 시계열을 이용한 실적단가 예측방안에관한 연구 한국건설관리학회 논문집,제 10권 제 4호 pp 50-57, 박원영, 서종원, 강상혁, 최봉준, 2009.7 ​ 17. 휴리스틱스를 활용한 지능형 굴삭 시스템의 Task Planning System 개발 대한토목학회논문집,제 28권 제 6D호 pp1-12, 이승수, 김정환, 강상혁, 서종원, 2008.11 ​ 16. 건설기계 자동화를 위한 기술 로드맵 개발에 관한 연구 대한토목학회논문집, Vol.28, No.40, pp.493-504, 김영석, 서종원, 이준복, 김성근, 2008.07 ​ 15. 원격조종 콘크리트 표면절삭 장비의 프로토타입 개발에 관한 연구 대한토목학회논문집, 이원식, 서종원, 문성우, 임종권, 2007.11 ​ 14. 다속성 효용이론을 활용한 터널환기방식 선정 한국건설관리학회논문집, 이혜진, 서종원, 강상혁, 박원영, 2007.06 ​ 13. 시설공사 입찰단가를 활용한 실적단가의 산정 방안에 관한 연구 한국건설관리학회논문집, Vol.7, No.5, pp.159-166, 강상혁, 서종원, 박원영, 송순호, 2006.10 ​ 12. An Overweight Permit Analysis System for Bridge Management 대한토목학회 영문논문집, Vol.10, No.2, pp.123-129, Hyun Ho Choi Jong Kwon Lim, Jong Won Seo, Pyung Ki Jung, 2006.03 ​ 11. 불확실 신뢰도 기법을 이용한 부식된 강구조물의 안전도 평가 대한토목학회논문집, 제26권, 제2A호, pp.293-300, 최현호, 조효남, 서종원, 선종완, 2006.03 ​ 10. 프로세스 시뮬레이션을 연계한 건설공정 시각화 한국건설관리학회논문집, 제7권, 제1호, pp.73-79, 서종원, 김영환, 정평기, 2006.02 ​ 9. 건설그래픽 시뮬레이션 시스템의 기능 개선을 위한 물리적 모델링 한국건설관리학회논문집, 제7권, 제1호, pp.80-88, 서종원,김영환, 정평기, 2006.02 ​ 8. 위험도 접근방법에 근거한 건설공사 안전영향평가 방안 대한토목학회논문집, 제25권, 제6D호, pp.847-855, 최욱, 서종원, 최봉준, 최현호, 2005.11 ​ 7. 생애주기비용에 기초한 항만시설의 다단계 설계 의사결정(I) - 방법론의 개발 - 대한토목학회논문집, 제25권, 제5D호, pp.697-705, 정평기, 서종원, 2005.09 ​ 6. 생애주기비용에 기초한 항만시설의 다단계 설계 의사결정(II) - 사례분석을 통한 방법론의 검증 - 대한토목학회논문집, 제25권, 제5D호, pp.707-719, 정평기, 서종원, 2005.09 ​ 5. 도로건설 사업에서의 설계 관리를 위한 정보모델, 대한토목학회논문집, 제25권, 제5D호, pp.729-737, 서종원, 조관희, 정평기, 2005.09 ​ 4. GIS를 이용한 도로 공사의 시공계획에 관한 연구, 대한토목학회논문집, 제25권, 제2D호, pp.287-295, 서종원, 강상혁, 2005.03 ​ 3. 교량구조물의 확률적 생애주기비용 및 가치분석 방법론, 대한토목학회논문집, 제25권, 제1D호, pp.117-126, 정평기, 지승구, 서종원, 2005.01 ​ 2. 확률적 LCC분석기법을 활용한 수도시설물의 설계VA모델에 관한 연구, 한국건설관리학회논문집, 제5권, 제2호, pp.181-193, 정평기, 서종원, 임종권, 2004.04 ​ 1. 시공 및 유지보수의 자동화를 위한 그래픽 조종 인터페이스 대한토목학회논문집, 제23권 제3D호 pp.359-367, 서종원, 2003.05 ​

▽ 국제 학술발표논문 32. Development of Web-GIS based Fleet Telematics System for Heavy Construction Equipment 2017 ISARC Proceedings Roller, Jongwon Seo,2017 31. Study on Analysis Method for Intelligent Compaction 2017 ISARC Proceedings Roller,Jongwon Seo,2017 30. Protocols for ICT based Smart Earthwork System 2017 ISARC Proceedings, Jongwon Seo, Seungsoo Lee, Waqas Tanoli, Hassnain Raza, 2017.06 ​ 29. A GIS Application to Efficient Haul Route Planning of Dump Trucks in Earthmoving 2017 ISARC Proceedings, Soohyun Park, Jongwon Seo, Sanghyeok Kang, 2017.06 ​ 28. Study on Analysis Method for Intelligent Compaction Roller 2017 ISARC Proceedings, SoominLee, SeungsooLee, and Jongwon Seo, 2017.06 27. Development of Web-GIS based Fleet Telematics System for Heavy Construction Equipment 2017 ISARC Proceedings, Seungsoo Lee, Jongwon Seo, 2017.06 26. Flexible Earthwork BIM Module Framework for Road Project 2017 ISARC Proceedings, Hassnain Raza, Waqas Tanoli, Seungsoo Lee, Jongwon Seo, 2017.06 ​ 25. PAD Based 3D Earthwork BIM Design Module for Machine Guidance 2017 ISARC Proceedings, Waqas Tanoli, Hassnain Raza, Seungsoo Lee, Jongwon Seo, 2017.06 ​ 24. Analysis of Accuracy Factor for 3D Reconstruction using 2D Image Obtained from Unmanned Aerial Vehicle (UAV) 33rd International Symposium on Automation and Robotics in Construction and Mining, H.L. Ko, S.W. Kwon, S.W. Chung, D.Y. Moon, J.W. Park, J.W. Seo and S.M. Kang, 2016.07 ​ 23. Machine Guidance Based Site Control Technology (SCT) for Earthwork Equipment Fleet 32nd International Symposium on Automation and Robotics in Construction and Mining, Jongwon Seo, Hakjune Lee, Leonildo N. Cassule, and Sungwoo Moon, 2015.06 ​ 22. A Study on Generation of 3D Model and Mesh Image of Excavation Work using UAV 32nd International Symposium on Automation and Robotics in Construction and Mining, D.H. Kim, S.W. Kwon, S.W. Jung, S. Park, J.W. Park and J.W. Seo, 2015.06 ​ 21. Integration of Smart Glass Technology for Information Exchange at Construction Sites 32nd International Symposium on Automation and Robotics in Construction and Mining, S. Moon and J. Seo, 2015.06 ​ 20. Energy Saving Effect of Intelligent Excavating System International Conference on Construction Engineering and Management, Jeonghwan Kim, Seung-Woo Pi, J. Seo, 2013.01 ​ 19. Task Planner for autonomous excavator considering work environment 2011 ISARC, PP.770-771, Jeonghwan Kim, Jongwon Seo, 2011.06 ​ 18. Optimized earthwork planning methodology for land development projects 2011 ISARC, PP.1332-1333, Hyeongi Baek, Jongwon Seo, 2011.06 ​ 17. Application of Appropriate Technologies to 3D Local Terrain Modeling in Real-time for Intelligent Excavating System (IES) 2009 ISARC, PP.357-364, Byungin Yu, Hyunseok Yoo, Youngsuk Kim, J. Seo, Seungwoo Han, 2009.06 ​ 16. Development of a heuristics-based task planning system for intelligent excavating system 2009 ISARC, PP.307-316, Seungsoo Lee, Jeonghwan Kim, Jinwoong Park, J. Seo, Youngsuk Kim, 2009.06 ​ 15. Model for design management in collaborative environmetn using design structure matrix and design parameters' information ICCEM-ICCPM 2009, P40 , PP1307-1312, Salman Akram, Jeonghwan Kim, J. Seo, 2009.05 ​ 14. Decision support system for optimal selection of haul routes based on time slots in earthmoving operation ICCEM-ICCPM 2009, P12, PP1134-1139, Sanghyeok Kang, Kyeonggeun Baik, Hyungi Baek, Hyeonggi Park, J. Seo, 2009.05 ​ 13. Task planning and visualization system for intelligent excavating system ICCEM-ICCPM 2009, S8-2, PP457-463, Jeonghwan Kim, Seungsoo Lee, Jinwoong Park, Jihyeok Yoon, J. Seo, 2009.05 ​ 12. 3D-GIS BASED EARTHWORK PLANNING SYSTEM FOR PRODUCTIVITY IMPROVEMENT 2009 Construction Research Congress, P151-160, Sang Hyeok Kang, J. Seo, and Kyeong Geun Baik,2009.05 ​ 11. Model for Design Management in Roadway Project Development Transportation research board, Washington, D.C, USA, Kwanhee Cho, Salman Akram, Sanghyeok Kang, J. Seo, 2008.01.14 ​ 10. Prototyping and Automating a Concrete Surface Grinding Machine for Improving Infrastructure Conditions 23rd International Symposium on Automation and Robotics in Construction, Tokyo, Japan, pp.660-664, J. Seo, Sungwoo Moon, Sangju Kim, Wonsik Lee, Jongkwon Lim, 2006.10 ​ 9. Using GIS to Improve Roadway Construction Planning ICCEM 2005 - 1st International Conference on Construction Engineering and Management, Seoul, Korea, pp.643-648, Sanghyeok Kang, J. Seo, 2005.10 ​ 8. Information Model for Design Management in Roadway Construction Projects ICCEM 2005 - 1st International Conference on Construction Engineering and Management, Seoul, Korea, pp.1165-1170 Kwanhee Cho, J. Seo, 2005.10 ​ 7. GIS-Based Roadway Construction Planning ISARC 2004 - 21st International Symposium on Automation and Robotics in Construction, Jeju, Korea, pp.212-217 Sanghyeok Kang, J. Seo, 2004.09 ​ 6. Graphical Simulation System for Planning and Visualizing Construction Processes ISARC 2004 - 21st International Symposium on Automation and Robotics in Construction, Jeju, Korea, pp.401-406 Younghwan Kim, J. Seo, 2004.09 ​ 5. Value Analysis Methodology Using Probabilistic Life Cycle Cost Analysis for Public Water Supply System SAVE International 44th Annual Conference Proceedings, Montreal, Quebec, Canada, Technical Papers 200442(CD) Jung Pyungki, J. Seo, Lim Jongkwon, Lee Jaesun, Cho Kookrae, 2004.07 ​ 4. A Tele-robotic System with Dynamic Graphical Interfacing for Electrical Power Plant Maintenance International Conference on Field and Service Robotics, pp.389- , J. Seo, Kamel S. Saidi, Carl T. Haas, S.V. Sreenivasan, Alfred E. Traver, Robert Frank, 1999 ​ 3. Design of a Tele-Robotic System for the Maintenance of Boiler Hoppers in Electric Power Plants ASME Design Engineering Technical Conference, Kamel S. Saidi, J. Seo, S.V. Sreenivasan, Carl T. Haas, Alfred E. Traver, 1998.09 ​ 2. Leveling Technologies for Building Construction ASCE Construction Congress V, 1997 ​ 1. Graphical Simulation for Design of a Tele-operated Clinker Clearing Robot 14th International Symposium on Automation and Robotics in Construction, pp.305- , J. Seo, Carl Haas, Alfred Traver, S.V. Sreenivasan, Robert Stone, Richard Greer, Chris Wunz, 1997.06 ​

▽ 국내 학술발표논문 112. Waste Lime Earthwork Management Using Drone and BIM Technology for Construction Projects: The Case Study of Urban Development Project;Soomin Lee;2023.12 111. RECATE : REmote Cruise-Control And Turn for Excavator;Faten Benrouba, Jeonghwan Kim, Jongwon Seo;2022.10. 110. A Study on the Utilization of a Construction Equipment Remote Control System Using a Web-Based Map;Kim, Hee Yeon.Kim, Jeong Hwan.Seo, Jong Won;2022.10. 109. Development of Dump Truck Delivery Integrated Control System: Earthwork Case Study;Lee, Soo Min . Kim, Sun Jun . Park, Soo Hyun . Seo, Jong Won;2022.10. 108. A Study on the Operation Method of Construction Equipment using Optimal Route Navigation Technology;Lee, Soo Min . Seo, Jong Won;2022.10. 107. Smart Image Analysis and Recognition Methodology for Earthwork Operation Based on the Convolutional Neural Network Model;Deng Tao, Soomin Lee, Sunjun Kim, Jongwon Seo;2022.10. 106. Digital Twin-Based Hybrid Approach to Visualize the Performance of TBM;Kamran Latif , Abubakar Sharafat , Soohyun Park, Jongwon Seo;2022.10. 105. A Study on the Standardization of Data and Utilization.Application of System for Development of Server Software and API for Construction Integrated Control System;Kim, Sun Jun.Park, Soo Hyun.Lee, Soo Min.Seo, Jong Won;2022.10. 104. Digital Twin-Driven Optimization of Blast Design for Underground Construction;Abubakar Sharafat , Kamran Latif , Soohyun Park, Jongwon Seo;2022.10. 103. A Comparative Analysis of Automated Machine Guidance and Control Systems for Trench Excavation;Soohyun Park, Jeonghwan Kim, Soomin Lee, Jongwon Seo;2021.11. 102. Predicting TBM advanced rate in difficult ground conditions based on the artificial neural network using different training functions;Kamran Latif, Abubakar Sharafat, Jongwon Seo;2021.10. 101. Risk assessment of TBM advanced rate in the difficult ground using Event Tree Analysis (ETA);Abubakar Sharafat, Kamran Latif, Soohyun Park, Jongwon Seo;2021.10. 100. A Case Study on Earthwork Productivity for Technology Diffusion of Earthwork Equipment Automation; Park, Soohyun.Kim, Jeonghwan.Lee, Su-min.Seo, Jongwon;2021.10. 99. The use of Lean Management to recover from major delay, application on site in Roissy, France;Benrouba, F., Kim, J., Park, S., Ha, D., & Seo, J; 2021.10. 98. BIM-Based Augmented Reality (AR) Framework for Visualization and Monitoring of Underground Utilities;MS Khan, J Kim, S Park, J Seo;2021.10. 97. Facilitation of Hybrid Scanning Based As-built Bridge BIM During Facility Construction and Maintenance;DaHyeon Ha, YongKyu Kwon,MinHyuk Jeong, Jeonghwan Kim, JongWon Seo;2020.10. 96. An Algorithm for Earthwork Allocation in Task Planning of Intelligent Construction Equipment ;Soohyun Park. Jeonghwan Kim, Jongwon Seo;2020.10. 95. Application of Geotechnical Data in Using Industry Foundation Classes for Earthwork Equipment;Chansu Kang, Jeonghwan Kim, Jongwon Seo;2020.10. 94. Pipelines Reconstruction Monitoring and Performance Evaluation using Machine Guidance for Excavator and BIM model;Jeong, Min Hyuk.Lee, Soo Min.Jang, Jae Yeong.Kim, Jeong Hwan.Seo, Jong Won;2020.10. 93. Object-Based Design of Civil Infrastructure Based on BIM and Visual Programming;Muhammad Shoaib Khan, Jeonghwan Kim, Jongwon Seo;2020.10. 92. Integration of Geotechnical Properties for Earthwork Model Based on Building Information Modeling; Muhammad Shoaib Khan, Chansu Kang, Jeonghwan Kim, Jongwon Seo;2020.10. 91. 3D/4D Modelling of Integrated Underground Utility Excavation System based on BIM for Machine Guidance System;Abubakar Sharafat, Soohyun Park, Waqas Arshad Tanoli, Jongwon Seo;2020.10. 90. Development of BIM-IFC Standard Data Model Framework for Rock Support of Drill-and-Blast Tunnelling projects;Abubakar Sharafat, Kamran Latif, Muhammad Shoaib Khan, Jongwon Seo;2020.10. 89. ICT건설장비를 활용한 토공사의 표준품셈 제안에 관한 연구-일본 사례연구를 중심으로- 2019 대한토목학회 정기학술대회, 박수현・이수민・신승훈・김정환・서종원, 2019.10 ​ 88. 건설현장내 무선 통신 환경 구축을 위한 네트워크 구성 및 기본 모형 2019 대한토목학회 정기학술대회, 신승훈・이수민・김정환・박수현・서종원, 2019.10 ​ 87. 정교한 건설장비 원격조종을 위한 멀티모달 인터페이스와 익스텐디드 리얼리티 (eXtended Reality) 2019 대한토목학회 정기학술대회, 김정환・서종원・이동은, 2019.10 ​ 86. 단지현장의 머신가이던스 적용성 검토에 관한 연구 : 현장관계자와 자동화 장비운영자 반구조적 인터뷰를 중심으로 2019 대한토목학회 정기학술대회, 신승훈・이수민・김정환・박수현・서종원, 2019.10 ​ 85. Accuracy and Error Analysis of 3D Mapping using Unmanned Aerial Vehicle (UAV) for Earthwork Project 2019 대한토목학회 정기학술대회, Abubakar Sharafat・Jeonghwan Kim・Soohyun Park・Jongwon Seo, 2019.10 ​ 84. Urbanization and Sustainable Development of Underground Space for Utilities in Developing Countries 2018 대한토목학회 정기학술대회, Waqas Arshad Tanoli・Abubakar Sharafat・Jongwon Seo, 2018.10 ​ 83. Accurate Prediction of Cost, Time and Feasibility of TBM in Tunnel Construction Projects using Machine Learning Algorithms 2018 대한토목학회 정기학술대회, Abubakar Sharafat・Waqas Arshad Tanoli・Jongwon Seo, 2018.10 ​ 82. 지능형 건설장비 도입에 대한 기초연구 2018 대한토목학회 정기학술대회, 박수현・신승훈・서종원, 2018.10 ​ 81. 건설장비 통합 관제기술을 적용한 토공사에서의 성능평가에 관한 연구 2018 대한토목학회 정기학술대회, 이수민・신승훈・박수현・서종원, 2018.10 ​ 80. GIS 기반의 토공 운반경로 계획 시스템 개발 2017 대한토목학회 정기학술대회, 박수현・강상혁・서종원, 2017.10 ​ 79. 가속도계를 활용한 진동롤러의 작업 품질 평가 방법에 관한 연구 2017 대한토목학회 정기학술대회, 이수민, 이승수,신주용,서종원, 2017.10 ​ 78. 3D Design Method of Temporary Structure for Earthwork BIM 2017 대한토목학회 정기학술대회, Hu Hui Qin・Seung Soo Lee・Waqas Arshad Tanoli・Hassnain Raza・Jongwon Seo, 2017.10 ​ 77. 시공기면 패드설계정보를 활용한 3차원 토공 모델 생성 모듈 개발 2017 대한토목학회 정기학술대회, 김경태・이승수・서종원, 2017.10 ​ 76. 3D Design Methodology for Earthwork Sections using Subassembly Composer 2017 대한토목학회 정기학술대회, Waqas Arshad Tanoli・Seung Soo Lee・Hassnain Raza・Jongwon Seo, 2017.10 ​ 75. Methodology of Earthwork BIM Modeling & Un-excavated Volume Calculation of Road Project 한국건설관리학회 2016년도 정기학술대회, Hassnain Raza, Waqas Tanoli, Lee, Seung-soo,Seo, Jong-won, 2016.11 ​ 74. 토공사에 최적화된 3차원 BIM 설계 시스템 개발에 관한 연구 대한토목학회 2016년도 정기학술대회, 이수민, 이승수, 윤재상, 서종원, 2016.10 ​ 73. 굴삭기 머신가이던스를 활용한 토공작업 테스트 및 성능평가 대한토목학회 2016년도 정기학술대회, 윤재상, 이승수, 박수현, 이수민, 서종원, 2016.10 ​ 72. Earth Work Bim for Machine Guidance 대한토목학회 2016년도 정기학술대회, Waqas Tanoli, Hassnain Raza, Lee, Seung-soo, Lee, Chi-Seung, Seo, Jong-won, 2016.10 ​ 71. 광역 현장의 효율적인 토공장비관리를 위한 GIS-Web기반 토공관제시스템개발 대한토목학회 2016년도 정기학술대회, 윤정일, 이승수, 이유희, 박수현, 서종원, 2016.10 ​ 70. BIM기반 건설장비 모니터링 시스템용 좌표 변환에 관한 연구 대한토목학회 2016년도 정기학술대회, 박수현, 이학준, 이승수, 이수민, 서종원, 2016.10 ​ 69. 로컬영역에서의 토공장비 관제 모니터링을 위한 VR 시뮬레이터 개발 대한토목학회 2016년도 정기학술대회, 이승수, 윤재상, 이수민, 윤정일, 서종원, 2016.10 ​ 68. 토공 BIM 설계 시스템을 활용한 부지정지 사업의 설계적용사례에 관한 연구 대한토목학회 2016년도 정기학술대회, 이승수, 윤정일, 박수현, 이유희, 서종원, 2016.10 ​ 67. Machine Guidance Based Site Control Technology (SCT) for Earthwork Equipment Fleet 대한토목학회 2015년도 정기학술대회 Global Session, 서종원, 이학준, 레오닐도넬슨카술, 문성우, 2015.10 ​ 66. 댐 시설물의 누수예방을 위한 그라우팅 보강공법에 관한 연구 대한토목학회 2014년도 정기학술대회, 박지수, 한기승, 서종원, 2014.10 ​ 65. 도로분야 BIM 도입을 위한 표준화 횡단면 설게요소 데이터베이스 구축 한국건설관리학회2013년도  정기학술대회, 이민주, 박소담, 김정환, 박원영, 서종원, 2013.11 ​ 64. 공동도급공사의 문제점 및 해결방안에 관한 연구 -공동이행방식을 중심으로- 대한토목학회 2013년도 정기학술대회, 이민주, 김장태, 김정환, 서종원, 2013.10 ​ 63. 공기연장에 따른 계약금액 조정 개선방향 연구 대한토목학회 2013년도 정기학술대회, 김 솔, 박동윤, 박원영, 지승구, 서종원, 2013.10 ​ 62. 건설엔지니어링 기업의 무형자산 가치측정을 위한 요소분류체계 개발 대한토목학회 2013년도 정기학술대회 논문집, pp.757-769, 피승우, 허영란, 서종원, 2013.01 ​ 61. BIM기반 사회기반 시설물 유지관리에 관한 기초연구 한국구조물진단유지관리공학회 2012년도 학술발표대회, 지승구, 김정환, 김봉근, 김지원, 서종원, 2012.11 ​ 60. 친환경 건설장비 기술도입을 위한 기초연구 한국건설관리학회 2012년도 정기학술대회, 민지홍, 김솔, 서종원, 2012.11 ​ 59. 선형기반시설물 BIM 관리기술개발을 위한 선행연구 분석 한국건설관리학회 2012년도 정기학술대회, 이민주, 김정환, 박원영, 서종원, 2012.11 ​ 58. BIM기반 스마트 유지관리기술 도입의 경제적 타당성 검토를 위한 편익에 대한 연구 한국건설관리학회 2012년도 정기학술대회, 정태형, 김정환 서종원, 2012.10 ​ 57. BIM기반 스마트 유지관리기술 도입의 경제적 타당성 검토를 위한 편익에 대한 연구 대한토목학회 2012년도 정기학술대회 논문집, 정태형, 김정환 서종원, 2012.10 ​ 56. 설문 분석을 통한 토목 및 건설 부문의 연구개발 경쟁력 및 내,외부 환경분석 대한토목학회 2012년도 정기학술대회 논문집, 김정환, 서종원, 2012.10 ​ 55. 건설 엔지니어링 기업의 무형자산 가치측정 표준모형 개발을 위한 무형자산 분류 모델 개발 한국건설관리학회 2011년도 정기학술대회, 허영란, 피승우, 김정환, 서종원, 2011.11 ​ 54. 지능형 굴삭기의 최적 버킷영역 설정을 위한 기초연구 대한토목학회 2011년도 정기학술대회 논문집, 장준현, 김정환, 민지홍, 구본상, 서종원, 2011.11 ​ 53. 엔지니어링 기업의 무형자산 가치평가 적용을 위한 기초연구 대한토목학회 2011년도 정기학술대회 논문집, 허영란, 피승우, 김정환, 정태형, 서종원, 2011.11 ​ 52. 건설산업 재해발생 위험도 산정 시스템 구축을 위한 기초연구 대한토목학회 2011년도 정기학술대회 논문집, 설재남, 김정환, 허영란, 정태형, 서종원, 2011.11 ​ 51. 선로 이송장치 가설공법을 적용한 철도판형교 유도상화 한국철도학회 2011년도 춘계학술대회, 서종원, 장형식, 박준원, 민지홍, 2011.05 ​ 50. BIM 요소기술을 활용한 자동화 굴삭장비의 시각화 및 실시간 진도관리 한국 BIM학회 2011년도 정기학술대회, 김정환, 서종원, 2011.05 ​ 49. BIM 기반 토공장비 계획 및 운영 자동화 시스템 한국전산구조공학회 2011년도 정기학술대회, 김정환, 장준현, 민지홍, 서종원, 2011.04 ​ 48. 지능형 굴삭 시스템의 각 플랫폼 간의 효율적 이동을 위한 방안에 대한 연구 한국건설관리학회 2010년도 정기학술대회 논문집, pp.349-350, 장홍열, 윤중호, 김정환, 백현기, 지성현, 서종원, 2010.11 ​ 47. ARENA를 이용한 지능형 굴삭시스템의 시뮬레이션 모델 개발 한국건설관리학회 2010년도 정기학술대회 논문집, pp.193-194, 설재남, 김정환, 윤중호, 지성현, 서종원, 2010.11 ​ 46. 의사결정기법과 리스크 분석을 활용한 도심지 지하공사의 공법 선정 체계에 대한 기초연구 한국건설관리학회 2010년도 정기학술대회 논문집, pp.195-196, 지성현, 김정환, 백현기, 윤중호, 설재남, 서종원, 2010.11 ​ 45. 다중회귀분석을 이용한 기획단계 도로건설 공사비 예측 모델 개발 한국건설관리학회 2010년도 정기학술대회 논문집, pp.197-198, 백현기, 윤중호, 김정환, 지성현, 설재남, 서종원, 2010.11 ​ 44. 지능형 굴삭작업계획 시스템의 통합에 관한 기초연구 대한토목학회 2010년도 정기학술대회, 김정환, 윤중호, 장홍열, 서종원, 2010.10 ​ 43. 덤프트럭의 접근을 고려한 굴삭로봇의 작업영역 커버리지 계획 대한토목학회 2010년도 정기학술대회, 김정환, 윤중호, 장홍열, 백현기, 서종원, 2010.10 ​ 42. GIS 기반 네트워크 분석기법을 이용한 토공 운반경로 결정 모델 대한토목학회 2010년도 정기학술대회, 백현기, 백경근, 김정환, 지성현, 서종원, 2010.10 ​ 41. 공공하수처리시설에서의 소화가스를 이용한 신·재생에너지의 경제성 평가 대한토목학회 2010년도 정기학술대회, 박형만, 김정환, 서종원, 2010.10 ​ 40. 아스팔트 그루빙 작업의 품질관리 시스템에 관한 기초연구 2009한국건설관리학회 정기학술대회, 김정환, 서종원, 2009.11 ​ 39. 지능형 굴삭 시스템의 작업 계획 생성 시스템을 위한 Cell 내부에서의 플랫폼 순차 생성 알고리즘 개발 2009한국건설관리학회 정기학술대회, 윤중호, 김정환, 박진웅, 장홍열, 이승수, 서종원, 2009.11 ​ 38. 지능형 굴삭시스템의 Task Planning System 인터페이스 개발을 위한 Data Flow 연구 2009한국건설관리학회 정기학술대회, 박진웅, 김정환, 윤중호, 장홍열, 이승수, 서종원, 2009.11 ​ 37. 미국 CM회사 분석을 통한 국내 건설업계 조직 모형 수립 2009한국건설관리학회 정기학술대회, 윤성익, 김정환, 서종원, 2009.11 ​ 36. 단지개발공사 내부토공운반계획을 위한 공사용도로선정시스템 구축에 관한 연구 2009한국건설관리학회 정기학술대회, 백현기, 박형기, 강상혁, 백경근, 서종원, 2009.11 ​ 35. 토공사의 운반경로 결정을 위한 영향요소에 관한 연구 2009한국건설관리학회 정기학술대회, 백경근, 강상혁, 백현기, 박형기, 서종원, 2009.11 ​ 34. 토공운반로 및 가교 계획을 위한 타당성 분석 사례연구 대한토목학회 2009년도 정기 학술대회 논문집, 3562-3565, 백경근, 강상혁, 서종원, 2009.10 ​ 33. 도심지 대규모 지하공사의 리스크 관리를 위한 리스크 등록부 개발 대한토목학회 2009년도 정기 학술대회 논문집, 3535-3538, 윤지현, 김정환, 김경년, 서종원, 2009.10 ​ 32. 도심지 대규모 지하공사의 리스크 관리 시스템 개발에 대한 기초연구 대한토목학회 2009년도 정기 학술대회 논문집, 3531-3534, 지성현, 윤지혁, 김경년, 서종원, 2009.10 ​ 31. 자동화 굴삭시스템을 위한 Task Planning System(TPS)- 2009 전산구조공학회 정기학술발표대회,서종원, 김성근, 이승수, 김정환, 박진웅, 이민철, 2009.04 ​ 30. 작업의 효율성을 고려한 최적 플랫폼 위치 선정 방안 -굴삭기 제원에 따른 최적화- 한국건설관리학회 2008년도 정기 학술대회 논문집, pp.790-793, 이승수, 박진웅, 서종원, 김성근, 2008.11 ​ 29. Design Structure Matrix: An Approach to Reduce Iteration and Acquire Optimal Sequence in Construction Design and Development Projects 한국건설관리학회 2008년도 정기 학술대회 논문집, pp.638-641, 살만 아크람, 김정환, 서종원, 2008.11 ​ 28. 지능형 굴삭시스템 개발 -2차년도 연구내용- 한국건설관리학회 2008년도 정기 학술대회 논문집, pp.184-192, 서종원,기영욱, 장달식, 이승수, 2008.11 ​ 27. 토공 작업의 영향요소 및 숙련된 굴삭기 운전자의 행동양식 분석 대한토목학회 2008년도 정기 학술대회 논문집, pp.1867-1870, 이승수, 김경년, 서종원, 2008.10 ​ 26. 지능형 굴삭 시스템을 위한 시뮬레이터 Task Planning System 개발 대한토목학회 2008년도 정기 학술대회 논문집, pp.1863-1866, 박진웅, 이승수, 김정환, 서종원, 2008.10 ​ 25. 굴삭기 제원에 따른 최적의 로컬영역 산정에 관한 연구 대한토목학회 2008년도 정기 학술대회 논문집, pp.1859-1862, 이승수, 백경근, 서종원, 2008.10 ​ 24. 마이크로 스테이션을 활용한 토공장비의 굴삭 시뮬레이션 대한토목학회 2008년도 정기 학술대회 논문집, pp.1855-1858, 김정환, 이승수, 박진웅, 서종원, 2008.10 ​ 23. 다속성 효용이론에 기초한 경량전철 시스템의 산정 대한토목학회 2008년도 정기 학술대회 논문집, pp.1847-1850, 하승우, 강상혁, 서종원, 2008.10 ​ 22. 토공계획 업무 효율성 향상을 위한 3차원 GIS 기반의 객체지향 클래스 구축 대한토목학회 2008년도 정기 학술대회 논문집, pp.759-762, 강상혁, 백경근, 서종원, 2008.10 ​ 21. 사회기반시설(부식된 강구조물)의 안전도 평가에 관한 연구 한국방재학회 학술발표회, 강상혁, 최현호, 서종원 2008.02 ​ 20. Security and Risk를 기반으로 한 교량구조물의 재난 안전성 평가 한국방재학회 학술발표회, 최현호, 서종원, 강상혁 2008.02 ​ 19. 터널공사에서의 안전영향평가의 적용 한국방재학회 학술발표회, 김병식, 최봉준, 서종원 2008.02 ​ 18. 토공사에서의 재해 방지를 위한 지능형 굴삭 시스템의 계획생성과정 한국방재학회 학술발표회, 이승수, 서종원 2008.02 ​ 17. 콘크리트 도로 표면절삭 작업을 위한 자율주행 진로계획 수립 방안 한국건설관리학회 2007년도 정기 학술대회 논문집, pp.929-933, 문성우, 서종원, 양병수, 이원식 2007.11 ​ 16. 지능형 굴삭시스템 개발 -연구단 소개- 한국건설관리학회 2007년도 정기 학술대회 논문집, pp.197-204, 서종원 2007.11 ​ 15. 콘크리트 표면절삭 장비의 품질관리를 위한 머신비전 알고리즘 개발 한국건설관리학회 2007년도 정기 학술대회 논문집, pp.983-986, 김정환, 서종원, 송순호, 이원식 2007.11 ​ 14. 지능형 굴삭을 위한 토공작업계획 시스템의 구조 설계 한국건설관리학회 2007년도 정기 학술대회 논문집, pp.921-924, 이원식, 송순호, 이승수, 서종원, 김성근, 2006.11 ​ 13. 다속성효용이론에 근거한 부동산 개발사업 의사결정 방안 대한토목학회 2007년도 정기 학술대회 논문집, 박원영, 강상혁, 이정호, 서종원, 2007.10 ​ 12. 교량구조물의 Risk 기반 재난영향평가 방안 대한토목학회 2007년도 정기 학술대회 논문집, 최현호, 강상혁, 서종원, 조효남 2007.10 ​ 11. 입찰단가에 기초한 실적공사비 산정방안 대한토목학회 2006년도 정기 학술대회 논문집, pp.958-961, 강상혁, 서종원, 박원영, 송순호, 2006.10 ​ 10. RFP 합성보의 생산성 증진에 관한 연구 대한토목학회 학술발표회논문집, pp.4795-4799, 김형진, 배승진, 서종원, 2005.10 ​ 9. 위험도 방법에 근거한 건설공사 안전영향평가 방안 대한토목학회 학술발표회논문집, pp.4808-4812, 최욱, 최봉준, 서종원, 2005.10 ​ 8. 위험도 접근방법에 의한 건설사업 안전영향평가방안에 관한 연구 한국건설관리학회 학술발표대회논문집, pp.504-509, 최현호, 정평기, 서종원, 최욱, 2004.11 ​ 7. 건설 그래픽 시뮬레이션 시스템의 기능개선에 관한 연구 한국건설관리학회 학술발표대회논문집, pp.543-547, 김영환, 서종원, 2004.11 ​ 6. 3차원 GIS를 이용한 도로 공사의 시공계획 - 토공장비 운용계획을 중심으로 대한토목학회 학술발표회논문집, pp.5047-5051, 강상혁, 서종원, 2004.10 ​ 5. 건설공사의 계획과 시각화를 위한 그래픽 시물레이션 시스템 대한토목학회 학술발표회논문집, pp.5077-5079, 김영환, 서종원, 2004.10 ​ 5. 교량구조물의 확률적 LCC 및 VA 방법에 의한 의사결정방법론 대한토목학회 학술발표회논문집, pp.1856-1861, 정평기, 서종원, 지승구, 2004.10 ​ 4. 불확실성 모델을 사용한 퍼지 위험도 분석 한국건설관리학회 학술발표대회논문집, pp.473-476 최현호, 서종원, 정평기, 2003.11 ​ 3. 수도시설의 설계VA 및 LCC분석모델 한국건설관리학회 학술발표대회논문집, pp.469-472 임종권, 정평기, 서종원, 이재선, 조국래, 2003.11 ​ 2. 도로 공사의 시공계획을 위한 GIS의 적용 한국건설관리학회 학술발표대회논문집, pp.565-568, 강상혁, 서종원, 2003.11 ​ 1. GIS를 이용한 도로 공사의 시공계획 대한토목학회 학술발표회논문집, pp.2858-2863, 강상혁, 서종원, 2003.10 ​

bottom of page